Skip to navigation Skip to content

Morehouse Brook Flow Restoration Planning, Stormwater Scoping, Design, and Construction Oversight

Morehouse Brook has been designated impaired by the Vermont Agency of Natural Resources (ANR) due to uncontrolled stormwater runoff. The TMDL for Morehouse Brook requires a 15% increase in stream flows at the mouth of the Brook during low flow conditions, and the high flow target requires a 54% reduction in flows at the mouth during the one-year storm event.