Skip to navigation Skip to content

Chestnut Hill Stormwater Mitigation and Channel Restoration Design

In 2018, Stone worked with the City of Montpelier and Friends of the Winooski River to assess the 42-acre drainage area and develop design plans for stormwater mitigation, proper culvert sizing, and improved stability and resilience of the downstream drainage channel, while maximizing the use of green infrastructure practices.