Stevens River Bank Stabilization
Stone Environmental was hired by the Connecticut River Conservancy to provide engineering design and construction management services for a bank stabilization project along a portion of the Stevens River in Barnet, Vermont. The project area included a bend that was migrating towards residential property, threatening to cut off access to a portion of the property used as a pasture. Stone performed a geomorphic assessment to determine the source of the issue.